噹(dang)前位(wei)寘:首頁(ye)>文(wen)章中(zhong)心>廢氣洗(xi)滌(di)咊環保(bao)技(ji)術>通過池(chi)壁從(cong)外側(ce)安(an)裝

通(tong)過池(chi)壁從(cong)外(wai)側安裝(zhuang)

髮(fa)佈(bu)時(shi)間:2016-02-11 點擊數:8477

Through-the-wall installation with shutoff device

The ejector is installed outside the tank wall and is operated by a dry-mounted pump. Connections for motive flow and compressed air are also outside the aeration tank.

In this case the ejector is equipped in flow direction with a shutoff device down-steam from the motive nozzle.



Advantages

  • Motive nozzle can be checked at any time without having to empty the tank

Products

  • Ejector
  • Circulating pump



foxXX